
König + Neurath awarded EcoVadis Gold status for the thirnd time in a row.
König + Neurath awarded EcoVadis Gold status for the thirnd time in a row.
2019
König + Neurath awarded EcoVadis Gold status for the second time.
2019
Promotion of e-mobility with the implementation of a charging infrastructure (4 charging stations)
2019
König + Neruath receives the EcoVadis CSR gold status rating
2018
König + Neurath certifies the majority of products in line with the requirements of the US sustainability standard BIFMA LEVEL® (ANSI BIFMA e3-2014e).
2018
König + Neurath has almost the entire product portfolio certified according to Indoor Advantage Gold
2017
100% of the vehicle fleet fulfils the EURO 6 norm
2016
Since 2016 König + Neurath has been committed to the UN Global Compact corporate responsibility initiative and its principles in the areas of human rights, labour, the environment and anti-corruption
2016
Investment in modern fabric cutting machine for resource-saving material use
2016
König + Neurath commits to energy management in line with the requirements of DIN EN ISO 50001.
2015
Further energy savings in IT area (flatscreen monitors, printer optimisation etc.)
2012
Further cut-backs of harmful greenhouse gases in cleaning processes (solvents)
2010
Introduction of environmental certificates for all K+N products
2008
Conversion of the HGV fleet to AdBlue technology to reduce NOx emissions
2007
Construction of a modern production facility for room systems
2006
Introduction of biological waste water treatment for vehicle washing
2002
Set-up of a monitoring agreement for ecological product testing
2001
Founder member of “Umweltallianz Hessen” (Hessian Environmental Alliance)
Construction of a modern production facility with the largest photovoltaic system in the state of Hesse
Upgrading and modernisation of compressed air plant
2000
Introduction of the environmental management system in accordance with DIN EN ISO 14.001
1998
Introduction of the environmental management system in accordance with (EWG) 1836/93
1996
Modernisation of the UV paint line
1995
Implementation, as far as feasible, of plastic components labelling to facilitate recycling
1994
Cardboard packaging and bubble-wrap replaced with furniture covers for protection during transport
1993
All edge banding switched from polyvinyl chloride (PVC) to acrylonitrile butadiene styrene (ABS) and other bought-in parts switched to alternative plastics
Cardboard packaging materials switched to the reusable type
1992
Modernisation of existing compressed air plant
1990
Installation of a water treatment plant for waste water from the paint shop
Installation of a paint line for paints that set under UV light
1989
Installation of electronic particle filter for stack gas particulate removal
1988
All particle board switched to low-formaldehyde E1 grade particle board
1984
Contact us directly:
K+N International Ltd
+44 20 74909340
Write us
52 Britton Street
London EC1M 5UQ
Loading data